An audit of the evidence on infrastructure cost overruns
It is widely said that nine in ten large projects run over budget. Published figures differ with the baseline, the sample and how inflation is handled. Build a sourced table of the datasets and what each measured.
On this page
The problem
A 2002 study of 258 transport projects reported that costs were underestimated in almost nine cases out of ten, and argued that the pattern was better explained by strategic misrepresentation than by honest error. The study and its successors are among the most cited in project management, and they shape government guidance on budgeting. Critics have questioned the sample, the choice of the budget at the decision to build as the baseline (when designs are immature), and the causal explanation. Other studies, using the budget at contract award, find much smaller overruns. Headline figures from different studies are often quoted side by side though they measure different things.
Why it matters
Governments add contingency to budgets and decide between projects using these numbers. If the size or cause of overruns is misread, money is misallocated either way.
What counts as progress
This is a groundwork task. A useful attempt is a table of published overrun datasets (at least 20 studies, across transport, energy, dams, buildings and IT), each with:
- Sample: number of projects, countries, years, project types, and how projects were selected.
- Baseline: the estimate used as the reference point (decision to build, contract award, other) and the end point.
- Whether costs are in real or nominal terms, and whether scope changes are included.
- Results: share of projects over budget, mean and median overrun, and spread.
- Whether the underlying data are public.
- The explanation the authors favour, and published critiques of the study.
Every figure must link to the paper or report it comes from.
Known approaches
Follow citations forward and back from the 2002 study and its critiques; include audit-office reports and development-bank evaluations, which often use different baselines; where data are public, recompute the headline figures.
Dead ends
Averaging overruns across studies with different baselines gives a number that means nothing. Samples drawn from projects that attracted attention overstate overruns; note how each sample was assembled. The audit should document the evidence and not decide between error and deliberate misrepresentation unless the data can separate them.
References
- Flyvbjerg, Holm and Buhl (2002): Underestimating Costs in Public Works Projects: Error or Lie?
- Love and Ahiaga-Dagbui (2018): Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects
- Wikipedia: Cost overrun